Technical and economic feasibility of the Transisthmic Train in Mexico
DOI:
https://doi.org/10.34140/bjbv7n2-018Palavras-chave:
technical and economic feasibility, construction, rail transportResumo
The Tehuantepec Isthmus Interoceanic Corridor is a program carried out by the Mexican government in the country southeast to provide a multimodal transportation system and contribute to the economic and social development of the region. The existing railway line of 303 km in length was inaugurated in 1907, the design does not comply with the current regulations due to excessive curvatures and slopes, the track has some sections of low load capacity rails and wooden sleepers. The project contemplates the construction of the double-track railway line to link the ports of Coatzacoalcos and Salina Cruz with electric trains of 160 km/h maximum speed for passenger service and 120 km/h for the cargo transport. The project´s estimated cost is 2 billion dollars, which considers: track structure, signaling, communication systems, stations, and trains. This paper presents the technical and economic feasibility of the Transisthmic Train, considering the investment, operation, and maintenance costs, as well as the potential demand for passengers and cargo proposed by the Mexican authorities.
Referências
Agencia Reguladora del Transporte Ferroviario, (2020), Dirección de Estadística Ferroviaria. Anuario Estadístico Ferroviario 2019, Ciudad de México
Albalate, D. y Bel, G., (2015), La experiencia internacional en alta velocidad ferroviaria, FEDEA Universidad de Barcelona, España
Gorostiza, F., (2011), Renacimiento de los ferrocarriles mexicanos de carga, Asociación Mexicana de Ferrocarriles, México
International Transport Forum-OECD, (2014), Freight railway development in Mexico, France
Martner, C., (2012), El sur también existe: el corredor multimodal del istmo de Tehuantepec en la era de la globalización Región y sociedad / año xxiv / no. 54. 2012
Medina, S. (2013), El transporte ferroviario en México, Comercio Exterior vol. 63 no. 4, julioagosto,México.
Secretaria de Comunicaciones y Transportes, (2020), Anuario estadístico ferroviario, México
Secretaría de Comunicaciones y Transportes, (2022), Estadística mensual, enero 2022, México
Secretaría de Comunicaciones y Transportes, (2021), Datos viales, México
Secretaría de Hacienda y Crédito Público, (2012), Metodología global de las etapas que componen el ciclo de inversiones, México
Valdivieso, M., (2018), El ferrocarril nacional de Tehuantepec: un proyecto frustrado 1914-1937, Tesis de maestría, Instituto de Investigaciones Histórico Sociales de la Universidad Veracruzana, noviembre de 2018, México
Wu, Jianhong, (2013), The Financial and Economic Assessment of China’s High Speed Rail Investments, Roundtable on The Economics of Investment in High-Speed Rail, International Transport Forum
World Bank, (1982), The Railway Problem. Estados Unidos de América